CAPA as the hub
CAPAs in Swat iQua Suite are raised on their own or from a source record — a deviation, OOS, lab quality event, audit observation, stability failure or audit-trail review finding. A source-raised CAPA is approved through the source’s own approval chain, and the full CAPA work panel — verify, extend, close, review effectiveness — is available from inside the source record. Preparer, reviewer and approver must be different people; an action’s verifier cannot be its owner; an extension cannot be approved by the person who requested it. A hard overdue gate blocks final closure unless an approved extension exists.
Deviations and change control
Deviations and change controls share a four-actor lifecycle: initiator, reviewer, approver and decision-taker must all be different people. An e-signature on approval can be required per site. Actions carry their own verification and forward-only extension requests, and an interim close — with an e-signed justification — lets the record close while its open actions remain workable until final close. Change control adds an effectiveness review after closure, and its corrective mechanism is its own change actions.
OOS and lab incidents
OOS investigations run in up to three levels. Level 1 always runs; the server decides the current level, and each level has its own review and approval. Finalising locks the record, and the controlled print is only available after that. Lab quality events — OOT results, complaints and other incidents — follow the same level-by-level pattern, and both can raise a CAPA that is approved with the final level.
Audits, risk and suppliers
- Audits: internal, external and partner audits, with each observation able to raise its own CAPA
- Quality risk management: FMEA registers with RPN computed by the server and recalculated after mitigation, approved by QA with an e-signature
- Supplier qualification: per-site assessment plans, signature modes up to dual-person, risk-rated qualification scopes and versioned quality agreements that the purchasing gate checks
Daily email digests list overdue deviations, change controls, audits, trainings, CAPAs and pending extension approvals — routed to the right site.





