Revised Schedule MIndia · CDSCO GMP

Revised Schedule M — be inspection-ready, not just compliant on paper.

Revised Schedule M brings Indian GMP in line with international practice, and it is now in force for every manufacturer, large or small. Swat iQua Suite is designed to comply with Revised Schedule M: a connected quality system, controlled materials, electronic batch records, QC and release — on one platform built in India.

  • Deviation, CAPA, change control and OOS linked
  • Supplier qualification and approved sources
  • Electronic batch records with e-signed release
  • Product quality review from live records
Pharmaceutical capsules on a production line
10+
years of pharma expertise
85+
integrated modules
1–3
months to go-live
100K+
batches released

The regulation

What Revised Schedule M requires — Indian pharma GMP, raised.

Schedule M of the Drugs and Cosmetics Rules, 1945 sets the good manufacturing practice that Indian manufacturers must follow. Its revision, notified at the end of 2023, aligns Indian GMP much more closely with WHO GMP and international practice.

The revised schedule replaced a largely premises-and-equipment rulebook with a quality-system approach. Large manufacturers had to comply first; micro, small and medium enterprises were given more time. With those transition periods behind us, Revised Schedule M is now in force for every manufacturer, large or small — and CDSCO and state licensing authorities inspect against it.

What changed for manufacturers

  • A pharmaceutical quality system — management responsibility for quality, with deviations, CAPA, change control and investigations handled as one connected system.
  • Quality risk management — decisions on quality based on documented, proportionate risk assessment.
  • Product quality review — a regular review of each product’s batches, deviations, changes, complaints and results to confirm the process remains consistent.
  • Supplier qualification — approved suppliers of starting and packaging materials, quality agreements, and audits based on risk.
  • Qualification and validation — equipment, utilities, processes, cleaning and computerised systems qualified or validated.
  • Documentation and records — controlled SOPs, specifications, master formulae and batch records, with good documentation practice throughout.
  • Quality control and stability — documented testing, stability programmes, reference standards and calibrated instruments.
  • Complaints, recalls and self-inspection — systems to handle complaints, trace and recall product, and audit your own compliance.
  • Computerised systems — controls for systems used in GMP activities, including access, data integrity and audit trails.

For many Indian plants, the hardest part is not any single requirement but the volume of linked evidence: a deviation that should lead to a CAPA, a change that should update an SOP and retrain people, a supplier whose qualification decides whether a material can be ordered. Paper and disconnected spreadsheets make those links invisible. That is the gap a connected platform closes.

Where things stand

From notification to inspection.

The compliance deadlines have passed; state licensing authorities are now inspecting against the revised schedule. Status last checked 3 November 2026 — always confirm the latest notices on the CDSCO website.

  1. Dec 2023

    Revision notified

    Revised Schedule M notified under the Drugs and Cosmetics Rules, 1945, aligning Indian GMP with WHO GMP.

  2. 2024

    Large manufacturers

    Manufacturers with turnover above ₹250 crore had to comply first, within months of notification.

  3. 31 Dec 2025

    MSME extension ends

    Smaller manufacturers that applied for an extension had until 31 December 2025 to upgrade.

  4. Now

    Risk-based inspections

    Units are being inspected against the revised schedule, and non-compliance can lead to regulatory action against the licence.

2-minute explainer

Revised Schedule M: what inspectors check.

Get ready

Find your gaps before an inspector does.

  • Free readiness assessment

    Twenty-five questions on what inspectors check. See your score by area as you answer; the full gap report arrives by email.

    Start the assessment
  • Gap checklist (Word + PDF)

    A practical checklist to walk your site area by area, with space for evidence, owner and target date.

    Get the checklist
  • See a deviation become a CAPA

    A 2-minute tour of the connected quality system the revised schedule expects — on real product screens.

    Take the QMS tour

What inspectors check

Where Schedule M inspections usually find gaps.

Inspectors follow the evidence. These are the areas where plants most often struggle to show it.

  • A quality system that works

    Management review, product quality review and self-inspection on schedule — with actions followed through, not just minuted.

  • Deviations that lead somewhere

    Every deviation investigated to a root cause, linked to a CAPA with an effectiveness check, and closed before release.

  • Records you can trust

    Contemporaneous, attributable entries; controlled forms; corrections that keep the original — on paper and in systems.

  • Materials under control

    Qualified suppliers, quarantine until QA release, verified dispensing and reconciled printed packaging.

  • A lab that holds up

    Phased OOS investigations, second-person review, stability on schedule and instruments in calibration.

  • Validated systems

    Processes, cleaning, equipment and computerised systems validated — with audit trails and access control where records are electronic.

Requirement → module

Revised Schedule M requirements, mapped to Swat iQua Suite.

  • Pharmaceutical quality system

    Deviations, OOS, lab incidents, audits and stability failures escalate into one CAPA register, with source-driven approval, verified actions and effectiveness review.

    Pharma QMS
  • Quality risk management

    FMEA-based risk registers for a product, process, change or deviation. The server computes RPN as severity × occurrence × detection; approval is e-signed.

    Risk management
  • Product quality review

    Batch, deviation, CAPA, OOS, change control and EM figures for the review period, frozen into a snapshot that cannot be changed, with e-signed approval.

  • Supplier qualification

    Assessment plans, site risk ratings that drive audit frequency, versioned quality agreements, and a purchase-order gate that only accepts qualified, in-date sources.

    Supplier qualification
  • Materials control

    Goods receipt into quarantine, identity always tested, evidence-gated QA release and an inventory ledger that never goes negative. Only released stock can be dispensed.

    GMP warehouse
  • Batch manufacturing records

    Electronic batch records from approved, versioned masters, with hold points, parameter limits, yield classification and an e-signed close.

    eBMR software
  • Quality control & stability

    Specifications, sample testing with second-person review, stability pull schedules, reagents and standards, and instruments with calibration due dates.

    Pharma LIMS
  • Documentation & training

    SOPs through prepare, review, approve and make-effective, with controlled copies; training created from the effective SOP version.

    Documents & training
  • Recalls & self-inspection

    One-click forward and backward traceability with recall reconciliation and effectiveness check; internal audits with observations raised into CAPA.

    Traceability & recall

Digitalise at your own pace

A phased route to Revised Schedule M evidence.

Start anywhere. Pay only for what’s live. Typical go-live is 1–3 months, depending on the modules and sites in scope.

  1. 01

    Quality foundation

    CAPA, deviations, change control, OOS, audits, SOPs and training — the core of the quality system.

  2. 02

    QC laboratory

    Specifications, sample testing, stability, instruments and environmental monitoring.

  3. 03

    Manufacturing & release

    Materials, dispensing, electronic batch records, packaging and evidence-based release.

  4. 04

    Sterile & insight

    Annex 1 controls, product quality review, continued process verification, risk management and inspection readiness.

Customer stories

From Indian API plants to UK laboratories.

“Ten years on, we would choose it again.”

We moved our QC LIMS onto SwatTech in 2016 and have never looked back. Every specification, result and calibration is one search away, and every change explains itself. When inspectors arrive, we don’t prepare — we simply open the system.

ARC Pharma UK LimitedUnited Kingdom · QC laboratory, since 2016

“Audits are something we welcome now.”

In contract testing, our reputation rides on every result we sign. A second-person review on every result, a complete audit trail and a client portal that delivers reports and CoAs on time have turned audits from something we braced for into something we welcome.

Lunar Labs LimitedUnited Kingdom · QC laboratory

“Any batch, traced in one click.”

In API manufacturing, traceability is everything. Today we follow any batch back to its raw-material lots and forward to every shipment in seconds. Revised Schedule M no longer feels like a deadline — it feels like the way we already work.

Norvium Healthcare Pvt. Ltd.India · API manufacturing

Shared responsibility

What Revised Schedule M still asks of your plant.

A system can hold your evidence and enforce your workflows. The schedule also asks for things only your organisation can provide.

  • Premises, equipment and utilities that meet the schedule — qualified, maintained and documented.
  • Senior management commitment to the quality system, with the resources to run it.
  • Your SOPs, specifications and master formulae, written for your products and approved through the system.
  • Validation of processes, cleaning and your installation of Swat iQua Suite. We support computerised system validation with requirements traceability and our team.
  • Trained, qualified people at every level, from operators to the quality head.

Swat iQua Suite is designed to comply with Revised Schedule M, alongside 21 CFR Part 11, EU GMP Annex 11 and Annex 1 and WHO GMP — so the same records serve CDSCO inspections and your export markets.

FAQ

Frequently asked questions

Can’t find your answer? Talk to our team — we reply within one business day.

Does Revised Schedule M apply to small manufacturers?

Yes. Micro, small and medium enterprises were given more time than large manufacturers to comply, but Revised Schedule M is now in force for every manufacturer, large or small.

Is Swat iQua Suite Schedule M certified?

There is no certification of software against Schedule M. Swat iQua Suite is designed to comply with Revised Schedule M, and your plant demonstrates compliance at inspection with the records it produces.

Can we start with only the quality modules?

Yes. Licensing is modular. Many plants start with the quality foundation — CAPA, deviations, change control, OOS, audits, SOPs and training — and add QC, manufacturing and sterile areas later. You pay only for the modules active in your current phase.

Does it help with export markets as well?

Yes. The same records support FDA, MHRA, EMA, CDSCO and WHO inspections. Swat iQua Suite is designed to comply with 21 CFR Part 11, EU GMP Annex 11 and Annex 1, WHO GMP and Revised Schedule M.

Is the product built in India?

Yes. Swat iQua Suite is built by SwatTech ERP Pvt. Ltd. in Rajkot, Gujarat, with 10+ years of pharma expertise. It is cloud-hosted, so there are no servers to buy or maintain on site.

How long does implementation take?

Typical go-live is 1–3 months, depending on the modules and sites in scope. Our team maps your processes, configures the system, supports your validation, trains your users and migrates your existing records.

Ready to see Swat iQua Suite in action?

Book a free, personalised demo and see how Swat iQua Suite takes your plants, labs and quality teams from paper to inspection-ready.

Download the brochure →