Sterile & Annex 1Room · operator · line ready

Sterile manufacturing software that blocks the step until conditions are met.

Swat iQua Suite is sterile manufacturing software built into the batch record: an aseptic step cannot start unless the operator’s gowning qualification is current, the cleanroom is ready, no environmental excursion is open and the line has a valid media fill. It covers the EU GMP Annex 1 controls for sterile and injectable manufacturing.

  • Server-side sterile step gate
  • Media fill validity per line
  • Failed sterile checks block release
  • Sterile modules only on sterile sites
Operators in cleanroom gowns on a sterile pharmaceutical production line
7
regulations designed for
25
modules enforce segregation of duties
3
e-signature levels
1–3
months to go-live

Real product footage

See Annex 1 controls in the product.

The sterile step gate

Four checks before any aseptic step starts.

The gate runs on the server when a sterile step starts in the batch record. The cleanroom and aseptic line are recorded on the step, and each check applies when they are captured.

  1. OperatorGowning

    Current gowning qualification

    Recorded with an e-signature; the assessor cannot assess themselves.

    Qualified
  2. RoomCleanroom

    Room ready and qualified

    Cleanroom register with grade, operation type and qualification status.

    Ready
  3. EMExcursions

    No open EM excursion

    An action-limit result opens an excursion that must be dispositioned.

    Blocks if open
  4. LineMedia fill

    Current passing media fill

    The filling line needs a passing aseptic process simulation within its validity period.

    Valid

If any check fails, the step does not start — the system enforces it, not a checklist on the wall.

Annex 1 in practice

Aseptic processing software for the revised Annex 1.

The 2022 revision of EU GMP Annex 1 asks sterile manufacturers to manage contamination risk as one connected strategy rather than a set of separate logbooks. That is exactly where linked electronic records help.

The revised Annex 1 expects a documented contamination control strategy, qualified personnel and gowning, environmental and utility monitoring against alert and action limits, aseptic process simulation, sterilisation and filtration under control, and inspection and integrity checks of the finished containers. Most sites already do this work. The difficulty is proving how each record relates to each batch.

All the sterile evidence, linked to the batch

In Swat iQua Suite the sterile modules feed the same batch record and release file. Gowning qualifications and cleanroom status come from environmental monitoring; media fill validity comes from aseptic process simulation; sterilisation cycles, filter integrity tests, lyophilisation cycles, container closure integrity tests and visual inspection runs are linked to the batch or finished lot. A failure in any of them raises a deviation and a release blocker, so the batch cannot be released by mistake.

Media fill and line qualification

Media fill protocols — fill volume, incubation, acceptance criteria and validity period — are prepared, reviewed and approved by three different people. Runs capture units filled, incubated and positive, and any positive unit means the run fails. A passing run approved by QA sets the line’s valid-until date, and a line with no current passing media fill cannot be used for aseptic filling.

Sterilisation and filter integrity

Sterilisation cycles — moist heat, dry heat, depyrogenation, gas, radiation and filtration — are recorded with equipment, load number and parameters, plus biological and chemical indicator results. QA release is e-signed and the operator cannot release their own cycle; a cycle with a failed BI or CI cannot be released at all. Filter integrity tests — bubble point, diffusive flow or water intrusion, before and after use — are verified with segregation of duties and an e-signature.

Utilities and environmental monitoring

Utility systems such as WFI, clean steam, compressed air and HVAC have versioned alert and action limits; each result freezes the limit in force, and an action breach raises a deviation. Environmental monitoring works the same way for cleanroom monitoring points, where an action result opens an excursion that is dispositioned with an e-signature.

Swat iQua Suite covers the Annex 1 controls described here. Your contamination control strategy, qualification and validation decisions remain your own — the system makes them enforceable and traceable.

Sterile modules

Annex 1 modules that share one batch record.

  • Aseptic Process Simulation (Media Fill)

    Versioned protocols and runs; a passing run sets the line’s validity, and any positive unit fails it.

    Media fill
  • Sterilisation Cycles & Filter Integrity

    Cycles with BI/CI results and pre- and post-use filter tests, released by QA.

    Sterilisation
  • Contamination Control Strategy

    The site CCS with a hazard → control → monitoring → effectiveness register, versioned and e-signed.

    Contamination control
  • Pharma Utilities Monitoring

    WFI, clean steam, compressed air and HVAC results against versioned alert and action limits.

    Utilities monitoring
  • Environmental Monitoring

    Cleanrooms, monitoring points, gowning qualifications and excursion handling.

    Environmental monitoring
  • Batch Release

    Sterile failures become release blockers automatically, and sterile checklist items appear only for sterile batches.

    Batch release

Lyophilisation, inspection & CCIT

The finishing steps, recorded with the same rigour.

The last steps before release are where sterile batches are most often lost — and where inspectors look for complete, contemporaneous records.

Lyophilisation cycles

Freeze-drying recipes hold the set points and acceptance criteria for freezing, primary drying and secondary drying, approved with segregation of duties and an e-signature. Each lyophilisation cycle is linked to its equipment and batch, and per-phase entries — shelf temperature, vacuum and time — are checked against the recipe limits. An out-of-limit entry raises a deviation, and corrections supersede the original value rather than overwriting it. Cycle approval is e-signed, and the approver cannot be the operator.

Visual inspection — 100% or AQL

Inspection runs are recorded per batch or finished lot, in 100% inspection mode or AQL sampling mode with the AQL level recorded. Units inspected and rejected are captured with a defect breakdown by category. The accept or reject decision is e-signed by someone other than the inspector, and a rejection raises a deviation and a release blocker.

Container closure integrity testing

CCIT results are recorded per batch or finished lot with container type, method, sample size, acceptance criteria, result and a supporting attachment. QA verifies the result with segregation of duties and an e-signature. A failing result raises a deviation and a critical release blocker on the batch.

Contamination control strategy

The site’s CCS is held as a controlled document with a register of hazards, controls, monitoring and effectiveness — optionally scoped to a product version. It is edited in draft, approved with an e-signature by someone other than its author, and supersedes the previous version for the same scope.

Sterile release

A failed sterile check cannot slip through release.

The release checklist for a sterile batch adds sterility, endotoxin and media-fill items. Failures in sterilisation, filter integrity, CCIT, visual inspection or media fill raise blockers automatically, and an environmental excursion dispositioned with sterile impact raises a critical blocker.

  • Checklist filtered by sterility — sterile items appear only for sterile batches.
  • Blockers derived from records — not ticked by hand.
  • Overrides only as documented exceptions — requested, then approved independently with an e-signature.
Batch release software
Swat iQua Suite batch release dossier with checklist items and their status

FAQ

Frequently asked questions

Can’t find your answer? Talk to our team — we reply within one business day.

Is Swat iQua Suite Annex 1 compliant?

No software is Annex 1 compliant on its own — compliance belongs to your facility, processes and quality system. Swat iQua Suite covers the Annex 1 controls for gowning, cleanroom readiness, environmental and utility monitoring, media fill, sterilisation, filter integrity, lyophilisation, CCIT, visual inspection and the contamination control strategy, and makes them enforceable in the batch record.

What stops an operator starting an aseptic step?

A server-side gate in the batch record. The step will not start unless the operator holds a current gowning qualification, the cleanroom is ready and qualified, no EM excursion is open in the room and the filling line has a current passing media fill.

Can we record both 100% inspection and AQL sampling?

Yes. Each visual inspection run records its mode — 100% inspection or AQL sampling with the AQL level used — with units inspected and rejected and a defect breakdown. Sample sizes follow your own procedure. The decision is e-signed by someone other than the inspector.

How are sterilisation cycles released?

QA releases each cycle with an e-signature, and the operator cannot release their own cycle. A cycle with a failed biological or chemical indicator cannot be released, and a failed cycle or filter integrity test raises a deviation and a batch release blocker.

Do non-sterile sites see the sterile modules?

No. The sterile modules sit behind a per-site sterile feature, so oral solid dose or API sites on the same installation never see them.

Can we adopt the sterile modules in phases?

Yes. Licensing is modular. Because the sterile gate works inside the batch record, most sterile sites start with batch records, environmental monitoring and media fill, then add sterilisation, lyophilisation, CCIT, visual inspection and utilities.

Ready to see Swat iQua Suite in action?

Book a free, personalised demo and see how Swat iQua Suite takes your plants, labs and quality teams from paper to inspection-ready.

Download the brochure →