From registration to Certificate of Analysis
In Swat iQua Suite every sample follows one controlled path: registered, routed to the right lab area, tested, reviewed, approved and released with a Certificate of Analysis. Samples can be registered by the lab, converted from an approved client sample request, or created by a stability pull. Routing by drug class sends microbiology, controlled and routine work to the right GMP location without anyone retyping it.
The specification version in force is frozen onto the sample at registration, and the specification is locked while samples against it are still open. If the specification is revised next month, past results keep the limits they were judged against — exactly what an inspector will check.
Results that cannot quietly change
Once an analyst submits results they are locked. A reviewer can send the sample back for re-entry, but the first entry and the reason for every change stay in the audit trail. Segregation of duties is enforced by the server: the reviewer cannot be the analyst, and the approver cannot be either of them. There is no administrator bypass on that chain, and e-signatures can be required at send-for-approval and at approval.
- Worksheets, sample labels and the CoA printed from the approved record, each enabled separately
- Working-day turnaround metrics for every sample
- An optional block on using an instrument that is out of calibration
- Reagents, standards, columns and consumables tracked with expiry status and controlled labels
Built for manufacturer QC and contract testing
Manufacturers use in-house QC testing for raw material, in-process, finished product, stability, water and microbiology samples, with limits frozen at test assignment and every result classified as within limits or OOS. Contract testing laboratories add the client portal, where clients submit requests and download the CoA only after it is released. Both run on the same specifications, instruments and audit trail.
Swat iQua Suite is designed to comply with 21 CFR Part 11 and EU GMP Annex 11, following ALCOA+ data-integrity principles. Validation of each installation remains the regulated company’s responsibility — we support it.






