Supply moduleASL · requisition · PO

GMP procurement software — order only from qualified sources.

Swat iQua Suite links purchasing to quality. Every purchase-order line must bind to an approved supplier list source that is in date on the PO date, with a quality agreement in force and a valid GMP certificate at the manufacturer site — checked when the line is added and again for every line at approval.

  • Approved supplier list per site and material
  • Source gate re-checked at PO approval
  • PO approval segregated and e-signed
  • Sources auto-expire past their approved-to date
Swat iQua Suite dashboard with pending approvals across modules

Real product footage

Watch a purchase order approved by QA.

Approved supplier list

A source gate on every purchase-order line.

The approved supplier list holds each approved source per site and material — the supplier’s dispatch site and the manufacturer’s site. A PO line can only use a source that passes every check on the PO date.

  • ASL approved and in date — the source status is Approved and the PO date is within its approved period.
  • Qualification scope effective — the supplier’s qualification covers this material.
  • Quality agreement in force — a current quality agreement exists for the source.
  • GMP certificate valid — a valid GMP certificate and verified capability at the manufacturer site.
Supplier qualification
Pharmaceutical capsules representing purchased materials

Pharma purchasing

Requisition to receipt, with quality at each step.

  1. Requisition

    Request

    A requisition is drafted, submitted and approved, then converted into a purchase order.

  2. PO draft

    Build the PO

    Each line binds to an approved supplier list source. The source gate runs as the line is added.

  3. Approval

    Approve

    Every line is re-checked. Approval is segregated from the requester and e-signed.

  4. Receipt

    Receive

    Goods receipts against the PO update it to partially received or received automatically.

  5. Closed

    Close

    The PO is closed. Rejection and cancellation are available with a reason.

PO approval e-signature and more

Procurement controls quality teams can rely on.

  • E-signed PO approval

    Approval is segregated from the person who raised the order and is e-signed.

  • Automatic source expiry

    A scheduled job expires sources past their approved-to date, so a lapsed source cannot be ordered from.

  • Suspend and reinstate

    Sources can be suspended, reinstated or changed through recorded requests with a reason.

  • Reduced-testing policy

    A versioned reduced-testing policy per source drives the testing level at receipt. Identity is always required.

    GMP warehouse
  • Business partner master

    Suppliers and customers with unique codes, shared across sites. Deactivation is blocked while testing is in progress.

  • Lab consumables purchasing

    RFQ baskets emailed to suppliers, multi-currency quotes compared side by side, and receipts into lab inventory or testing.

How it works

Purchasing that cannot bypass supplier qualification.

GMP expects starting materials to be bought only from approved suppliers, under a quality agreement, as part of a qualified supply chain — EU GMP Chapters 5 and 7, 21 CFR 211.84 and ICH Q7 all set expectations here. In many companies purchasing and quality run on separate systems, and the approved supplier list is a spreadsheet the buyer may or may not check. Swat iQua Suite puts the check inside the purchase order.

Sources, not just suppliers

An approved source in Swat iQua Suite is specific: one material, at one of your sites, from a supplier’s dispatch site and a named manufacturer site. Sources move from draft through pending to approved, and can be suspended, rejected or expire. Each carries its own versioned reduced-testing policy, which the warehouse uses at goods receipt to decide whether full, reduced or identity-only testing applies.

The gate at line and at approval

When a buyer adds a line, the system checks that the source is approved and in date on the PO date, that the qualification scope is effective, that a quality agreement is in force and that the manufacturer site has a valid GMP certificate and verified capability. Because circumstances change between drafting and approval, the gate runs again for every line when the PO is approved. Approval is segregated and e-signed, and goods receipts update the PO’s status automatically.

QC lab consumables

Laboratory purchasing has its own simpler route. Items are pooled into an RFQ basket that is emailed to suppliers; multi-currency offers are captured with an exchange-rate snapshot and compared side by side, with Excel export. Quotations and POs are generated as PDFs and can be emailed, finalisation can be e-signed, and partial receipts — with expiry dates — move into lab material inventory or are routed to testing.

FAQ

Frequently asked questions

Can’t find your answer? Talk to our team — we reply within one business day.

What does the source gate check?

That the approved supplier list source is approved and in date on the PO date, the qualification scope is effective, a quality agreement is in force, and the manufacturer site has a valid GMP certificate and verified capability. It runs when a line is added and again for every line at approval.

What happens when a supplier’s approval lapses?

A scheduled job expires sources past their approved-to date. An expired or suspended source cannot be used on a new PO line.

Who approves purchase orders?

A user with approval rights other than the requester. Approval is e-signed and recorded in the audit trail.

Does procurement affect incoming testing?

Yes. Each source has a versioned reduced-testing policy that the warehouse uses at receipt to decide full, reduced or identity-only testing. Identity is always tested.

Can the QC lab buy consumables through the system?

Yes. Lab consumables go through RFQ baskets emailed to suppliers, side-by-side quote comparison, quotation and PO PDFs, and receipts into lab inventory or testing.

Ready to see Swat iQua Suite in action?

Book a free, personalised demo and see how Swat iQua Suite takes your plants, labs and quality teams from paper to inspection-ready.

Download the brochure →