An OOS result in the LIMS should open an investigation in the QMS. A deviation raised at a batch step should block release. A CAPA that changes an SOP should retrain the operators before their next batch. When these systems are separate, each hand-off is an interface — or a person re-typing.
Swat iQua Suite covers all four areas on one platform, so the hand-offs are links on the same records rather than integrations.