Validation8 October 2026 · 7 min read

Computer software assurance (CSA) vs CSV: what changes for pharma

Computer software assurance has become the most discussed idea in GxP validation in years. But the CSA vs CSV debate is often framed as old versus new, when the real change is narrower: where you spend your testing effort and how much paperwork you produce. This guide explains what CSA is, what it changes for pharmaceutical manufacturers and what it does not.

CSV and CSA in one paragraph each

Computer system validation (CSV) is the documented process of establishing that a computerised system does what it is intended to do, consistently and reliably, throughout its life. In pharma it is required by 21 CFR Part 11 (validation of systems is among the controls in 21 CFR 11.10), by EU GMP Annex 11 and by the equivalent PIC/S and WHO texts. In practice, CSV grew into a heavily scripted, document-centred activity: long protocols, screenshots for every step and review cycles that often consumed more effort than the testing itself.

Computer software assurance (CSA) is the FDA’s risk-based approach to establishing confidence in software used in production and quality systems. The FDA issued its guidance, Computer Software Assurance for Production and Quality System Software, as a draft in September 2022 and finalised it in 2025. It asks manufacturers to focus assurance activities on software features that could directly affect product quality or patient safety, to use the least burdensome testing that gives adequate confidence, and to record only what is valuable.

The FDA CSA guidance is written for medical device manufacturers. Pharmaceutical companies are not bound by it, but its thinking is closely aligned with ICH Q9 quality risk management and with GAMP 5 Second Edition, which is why it has been widely adopted as good practice in pharma.

CSA vs CSV: what actually changes

From documentation to critical thinking

Traditional CSV often treated every requirement the same way. CSA starts by asking what the software is intended to do and what would happen if a feature failed. Features with high process risk — for example, a calculation that determines whether a batch passes, or an electronic signature that releases product — get rigorous, scripted testing. Features with low risk — a report layout, a search filter — may need little more than unscripted or exploratory testing.

More testing methods are acceptable

CSA explicitly recognises unscripted testing alongside scripted testing:

  • Scripted testing: step-by-step test cases with expected results — still right for high-risk features.
  • Exploratory testing: an experienced tester exercises the feature against test objectives without a fixed script, recording what was tested and the outcome.
  • Ad hoc testing: informal checks for low-risk features where a brief record of the result is enough.

Less evidence for evidence’s sake

Screenshots of every step rarely add assurance. CSA encourages a concise record: the intended use, the risk determination, the assurance activities performed, any issues found, a conclusion and who performed the work, and when. The record must still be sufficient for an inspector to understand what was done and why.

Leveraging the supplier

Where a supplier has a mature quality system and documented testing, you can use that work rather than repeat it — after assessing the supplier. GAMP 5 has long encouraged this; CSA makes it central.

What does not change

Misreading CSA as “less validation” is the fastest route to an inspection finding. Several things stay exactly as they were:

  • Validation is still required. Annex 11 and Part 11 still expect computerised systems to be validated for their intended use; CSA is one way of meeting that expectation.
  • Part 11 controls still apply: audit trails, electronic signatures (21 CFR 11.50 and 11.200), access controls and record protection are not risk-assessed away.
  • Data integrity expectations — ALCOA+ — are unchanged.
  • Change control, periodic review, incident management, backup and restore, and business continuity remain part of the system life cycle.
  • Traceability is still expected: an inspector should be able to follow a requirement through its risk assessment to the evidence that it works.
  • The regulated company remains accountable. A supplier can provide evidence; it cannot take on your responsibility for validation.

A practical CSA workflow for a GxP system

  1. Define intended use. Describe what the system does in your processes, which records it creates and which GMP decisions depend on it.
  2. Identify features and requirements. Break the system into features and record the requirements that matter for your use.
  3. Assess risk per feature. Ask whether a failure could directly compromise product quality, patient safety or data integrity (high process risk), or only indirectly (lower risk). Record the reasoning.
  4. Select assurance activities. Match the method to the risk: scripted testing for high risk, exploratory or ad hoc for lower risk, supplier evidence where it is adequate.
  5. Execute and record. Capture what was tested, the result, any defects and their resolution, and who did the work.
  6. Check coverage. Confirm every approved requirement is linked to a verified test or a documented rationale, and resolve any gaps.
  7. Conclude and release. Approve the validation summary, then keep the system in a validated state through change control and periodic review.

Steps 3, 4 and 6 are where CSA either succeeds or fails. A defensible risk assessment and a clean traceability view are what let a reduced testing effort survive an inspector’s questions.

Common pitfalls when moving from CSV to CSA

  • Rating everything low risk. If nearly every feature is assessed as low risk, the assessment will not be believed. Be honest about calculations, status changes, release decisions and signatures.
  • Unscripted testing with no record. Exploratory testing still needs a record of objectives, scope, results and the tester.
  • Skipping supplier assessment. Supplier documentation can only be leveraged after you have assessed the supplier’s quality system.
  • Forgetting the procedures. Your validation SOPs and templates must be updated to permit CSA methods, otherwise inspectors will compare your work against your own outdated procedures.
  • Losing traceability. Lean documentation is fine; broken links between requirements, risks and evidence are not.

How to talk about CSA with inspectors and auditors

Regulators outside the medical device world have not adopted the CSA guidance as such, but EU, UK and PIC/S inspectors have long expected a risk-based approach under Annex 11 and GAMP 5. Frame your approach in those terms: explain your risk methodology, show how it set the depth of testing, and demonstrate traceability from requirement to evidence. The vocabulary matters less than the reasoning — a clear, documented rationale is what inspectors are looking for.

How Swat iQua Suite supports a CSA approach

Swat iQua Suite follows a GAMP 5 risk-based validation approach and includes a CSA requirement and traceability register as a platform module that cannot be switched off:

  • A controlled register of system requirements, each with a risk level of low, medium or high.
  • Trace links from requirement through risk assessment, test case and execution to defects, each moving from planned to linked to verified or failed.
  • A coverage report showing which approved requirements have a verified test execution — and where the gaps are.
  • Approval with an electronic signature and segregation of duties: the approver cannot be the requirement owner.
  • Approved items cannot be edited; a controlled correction creates a new version and keeps the original.

The platform’s Part 11 controls — complete audit trail with a reason for every change, electronic signatures at three levels, segregation of duties in 25 modules, multi-factor login and trusted time — are the features your risk assessment will rate highest, and they are designed to comply with 21 CFR Part 11 and EU GMP Annex 11. Our team also supports your validation of your installation as part of implementation. Validation itself remains your responsibility as the regulated company; Swat iQua Suite gives you the traceability and evidence to carry it out efficiently.

FAQ

Frequently asked questions

Can’t find your answer? Talk to our team — we reply within one business day.

Does CSA replace computer system validation?

No. CSA is a risk-based way of performing validation. Systems used in GMP still have to be validated for their intended use under Part 11, Annex 11 and equivalent rules; CSA changes how the effort and documentation are focused.

Does the FDA CSA guidance apply to pharmaceutical companies?

It was written for medical device production and quality system software. Pharmaceutical companies are not bound by it, but its principles align with ICH Q9 and GAMP 5 Second Edition, and many pharma companies apply them.

Is unscripted testing acceptable in GMP?

For lower-risk features, yes, provided it is planned and recorded: the objectives, what was tested, the results, any issues and who performed it. High-risk features should still receive scripted testing.

What documentation does CSA still need?

Intended use, the risk assessment per feature, the assurance activities performed, results and defects, a conclusion and traceability from requirements to evidence — plus the usual life-cycle controls such as change control and periodic review.

Ready to see Swat iQua Suite in action?

Book a free, personalised demo and see how Swat iQua Suite takes your plants, labs and quality teams from paper to inspection-ready.

Download the brochure →